Owner’s Project Manager Projects



norfolkpolice__fire-renovation_rend

Project Details

 

  • $14M Project Budget
  • Project is currently in Design as of September 2016
  • Construction of a new Police Station
  • Renovation & Addition to the existing Public Safety Facility
  • Regional 911 Dispatch 2nd fl. of new Police Station
  • 180’ Tower Installation
  • Fiber Construction
  • Five Jail Cells
  • Two Fire Apparatus Bays
  • Fire Vehicle Exhaust System


metacomet_911_red

Project Details

 

  • $6.2M Project Budget
  • Project includes Towns of Norfolk, Franklin, Wrentham & Plainville
  • Project is currently in Design as of September 2016
  • 180’ Tower Installation
  • Regional “Microwave” Tower Infrastructure Installation
  • Fiber Construction
  • (8) Dispatch Consoles
  • Radio Equipment Installation
  • Cameras & Access Control Installation


Webster Police Station

Project Details

 

  • Police Station 2014/Renovated Fire Station 2016
  • OPM Town of Webster, MA
  • 22,000 SF New Police Facility
  • 20,000 SF Renovated Fire Facility
  • $12M Project Budget
  • $10M Construction Budget
  • $1.7 State 911 Regional Budget
  • Radio Tower, (4) Regional Dispatch Consoles for Webster, Dudley & Future Towns, (8) Jail Cells, etc.


dennisTownHall

Project Details

 

  • $3.5M Dollar Budget
  • New Selectmen’s Meeting Room, Town Staff Offices and renovations to the existing building
  • Construction completed early 2016


wrta_pic

Project Details

 

  • $76M Dollar Budget
  • +/- 18m Dollar Environmental Clean-Up
  • Construction completed in October 2016
  • Owner occupancy is in November 2016


Palmer Police Station

Project Details

 

  • Palmer Police Station 2014
  • OPM Town of Palmer, MA
  • 23,000 SF New Facility
  • $7.4M Project Budget
  • $6M Construction Budget
  • Radio Tower, (4) Dispatch Consoles for Future Regional Use, (8) Jail Cells, etc.


Acushnet Police NEWER

Project Details

 

  • OPM Services Town of Acushnet, MA, 2015
  • 11,000 SF New Facility
  • $5.74 Project Budget / $4.3 Construction Budget
  • Radio Tower, (2) Complete Dispatch Consoles, (4) Jail Cells


Gardner Police Station

Project Details

 

  • OPM Town of Gardner, MA, 2014
  • 31,000 SF New Facility
  • $14M Project Budget
  • $11M Construction Budget
  • Radio Tower, (5) Regional Dispatch Consoles for Gardner, Athol & Future Towns, (7) Jail Cells, etc.


Carnegie Mellon University School

Project Details

CDR Maguire provided construction oversight services to the Pennsylvania Office of the Budget for construction of the new $74-million Computer Science building at Carnegie Mellon University. This contemporary structure houses the (Bill) Gates Center for Computer Science, the Hillman Center for Future Generation Technologies, and the Planetary Robotics Laboratory.

CDR Maguireʼs services included monitoring compliance with special conditions of the ownerʼs grant agreement with the Commonwealth of PA, as well as compliance with state regulations for labor and procurement.


Rankin

Project Details

CDR Maguire provided design management services to the Allegheny County Department of Public Works for the rehabilitation of the Rankin Bridge, a 2,423-foot long steel truss bridge carrying PA S.R. 837 between Whitaker and Rankin over the Monongahela River, as well as the Union, NSC, and CSX railroads.

Following the I-35 bridge collapse in Minneapolis, the county decided to increase the budget for this $50M project to provide increased measures for rehabilitating the bridgeʼs gusset plates.

The project also included a cantilevered sidewalk to allow the bridgeʼs lanes and shoulders to be widened.


Mcardle

Project Details

CDR Maguire provided design management services to the City of Pittsburgh for the rehabilitation of the McArdle Viaduct No. 1. This 215-foot through truss bridge spans a total of 548 feet and carries traffic on the McArdle Roadway from Mount Washington to the South Side over the CSX railroad.

The project included complete replacement of the approach spans along with preservation of the existing abutments, pier foundations, and historic truss span.

Vintage cast iron railing along the outer edge of the sidewalk was retained, while a new PA Type 10M bridge barrier was installed along both curbs of the roadway.


Montague Police Station

Project Details

 

  • OPM Town of Montague, MA, 2009
  • 13,000 SF Addition to existing Fire Station
  • $8.5M Project Budget
  • $7.8M Construction Budget
  • (3) Dispatch Consoles, (4) Jail Cells, Geothermal Well, Low Maintenance Terrazzo Flooring, etc.


mortonmiddleschool_pic

Project Details

CDR Maguireʼs Ownerʼs Project Management Group provided pre-construction services including design document review, contractor and subcontractor pre-qualification, oversight for building demolition, and abatement for the transformation of the long-standing James Madison Morton Middle School into a state-of-the-art, comprehensive facility.

It will now meet the needs of all Fall River students for years to come.

The new building of approximately 135,000 square feet will have details and elements of the former building incorporated into its new construction.


Hudson Fire Headquarters

Project Details

CDR Maguire designed the new fire headquarters for the Hudson Fire Department, which was constructed on a 71-acre parcel of town-owned land adjacent to the Assabet River.

The new facility has an apparatus floor consisting of five double bays and two drive-thrus, as well as 13,800-square feet of administration, personnel quarters, and support space. A two-story configuration was developed to minimize the footprint of the building, respond to the site constraints, and allow for future expansion to accommodate growth of the town and the department.